A mold project moves from a part drawing to a production tool through a series of review and approval steps. Clear communication at each stage reduces rework and shortens the path to stable production.
1. Design analysis
Review the part geometry, material, draft, wall thickness and quality requirements. Identify features that may affect filling, cooling or ejection.
2. DFM and mold-flow review
A design-for-manufacture report and mold-flow analysis highlight fill, warp, cooling and gate risks before the mold design is finalized.
3. Mold design and manufacture
Finalize the mold layout, runner system, cooling circuit and ejection. Manufacture the mold base, cavity and core inserts, then assemble and fit the tool.
4. Sample and approval
Mold the first samples, measure critical dimensions and review appearance. Adjust the tool if needed and obtain approval before mass production.
5. Production and delivery
After approval, the mold is adjusted for production, packaged and shipped. Documentation and after-sales support complete the project.

Send your drawing and requirements for a mold review.